Alex is a co-founder of Sprintlaw. Alex previously worked at a top-tier firm as a lawyer specialising in technology and media contracts, and founded a digital agency which he sold in 2015.
Priya runs a small kitchen renovation business in Hamilton. She measures a customer's kitchen, orders custom cabinetry, pays her installer, then gets a text the week before install saying the customer wants to move the pantry and swap the benchtop colour.
Nothing has gone wrong yet, but Priya's costs have already changed. Without clear customer terms, she may be left arguing about who pays for the new materials, whether the deposit is refundable, and whether the install date still stands.
If you supply and install kitchens, wardrobes, flooring, blinds, fixtures or renovation products in homes, a written supply and install agreement or customer terms and conditions helps set expectations before anyone picks up a tool. It doesn't need to be complicated, but it does need to deal with the real issues that come up on residential jobs.
- Do You Need A Supply And Install Agreement?
- How Should You Deal With Measurements, Site Access And Customer Delays?
- What Happens If The Customer Changes Their Mind?
- What Warranties And Consumer Guarantees Apply To Residential Work?
- Supply And Install Agreement Template: What To Include
- Common Mistakes To Avoid
- Key Takeaways
Do You Need A Supply And Install Agreement?
Yes, if your business supplies products and installs them in a customer's home, you should have written terms before you order materials, engage suppliers or book trades.
A supply and install agreement is different from a simple quote. A quote usually says what you're providing and what it costs. Your agreement should also explain how the job will run, what happens if things change, and what rights each side has if there are delays, defects or unpaid invoices.
This is especially useful where you deal with:
- custom-made products, such as cabinetry, wardrobes, blinds or benchtops
- materials ordered from overseas or made to measure
- installation work that depends on site readiness
- homeowners who may not understand what is included in a renovation quote
- multiple visits, progress payments or staged work
For some residential building work, New Zealand's Building Act 2004 adds extra requirements. If the residential building work is priced at $30,000 or more including GST, you generally need a written contract, and you must give the customer the prescribed disclosure statement and checklist before they sign. Even if your job is under that threshold, a customer can ask for these documents.
Some supply and install jobs may also involve building consent, restricted building work or licensed building practitioners. That depends on the work itself, not just the label you put on the job. If you're unsure whether your installation falls into that category, get tailored advice before you use standard terms.
What Should Your Agreement Say About Deposits And Payments?
Your agreement should clearly say when the customer pays, what the deposit covers, and what happens if the job is cancelled after you've committed costs.
Deposits are common in renovation supply and install work because you may need to order materials, lock in manufacturing slots or pay suppliers before installation starts. The issue is that deposits can become messy if your terms simply say deposit required and nothing else.
Your payment clause should cover:
- Deposit amount: the percentage or dollar amount due before you order products, enter supplier commitments or schedule work
- What the deposit covers: for example, design time, site visits, supplier orders, manufacturing arrangements, administration and booked labour
- Progress payments: any payments due at milestones, such as order confirmation, delivery to site, installation start or practical completion
- Final payment: when it's due, and whether small defects stop the whole final payment or only a reasonable amount
- Late payment: any interest, reasonable recovery costs or suspension rights, if you want to include them
There isn't one deposit percentage that works for every renovation business. A business ordering custom stone benchtops has different cashflow risk from a business installing stocked shelving. What matters is that your deposit reflects genuine upfront costs and is explained clearly.
Worked Example: A Deposit That Matches The Risk
Say Aroha's flooring business quotes $8,000 including GST for engineered timber flooring. The product cost is $4,200, and the supplier requires payment before dispatch. Aroha's terms require a 60% deposit of $4,800 before ordering, with the balance due on completion.
If the customer cancels after the flooring has been ordered, the agreement says Aroha can keep the part of the deposit needed to cover non-refundable supplier costs and reasonable work already performed. That's much easier to explain and enforce than simply saying all deposits are non-refundable, which can create Fair Trading Act 1986 and Consumer Guarantees Act 1993 concerns if it's unfair or misleading in context.
How Should You Deal With Measurements, Site Access And Customer Delays?
You should spell out who is responsible for measurements, what site access you need, and what happens if the customer's home isn't ready when your installer arrives.
Measurements are one of the biggest risk points for supply and install businesses. If your product is made to measure, even a small error can create a big cost. Your agreement should say whether the customer has provided measurements, whether you'll verify them, and which measurements are final for manufacturing.
For example, your terms might say that:
- customer-provided measurements are estimates only unless you confirm them in writing
- you won't order custom products until a final site measure is completed
- the customer must tell you about hidden services, uneven floors, damp areas or structural issues they know about
- you may need to change the price or timeframe if site conditions differ from what was visible at the measure
Site access also needs practical detail. Your installer may need parking, power, clear work areas, safe access, pets secured, old appliances disconnected or other trades finished before you arrive. If you don't say this upfront, you can end up paying staff to wait around while the customer tries to clear a room.
Your agreement can also include a missed appointment or delay clause. For example, if the customer doesn't give access at the agreed time, you may charge a reasonable call-out fee, reschedule the work, and extend the completion date. Keep these charges fair, specific and easy to justify.
Health and safety should be covered too. Even in a home, your business has duties under the Health and Safety at Work Act 2015. If the site is unsafe, you should be able to pause work until the issue is fixed.
What Happens If The Customer Changes Their Mind?
If the customer wants to change the design, product or installation scope, your agreement should require a written variation before you do the extra work or order different materials.
Variations are normal in home renovation work. A customer may choose a different handle, add splashback tiling, change the layout or ask your installer to do an extra task on the day. The problem isn't the change itself. The problem is doing the change without agreeing the extra cost and delay.
A good variation clause should cover:
- how the customer requests a change
- whether you can accept or reject the change
- how you'll price extra work, materials, freight and administration
- whether the original timeline moves
- when the customer must pay for the variation
You can keep the process simple. For smaller jobs, a text or email confirming the change, price and timing may be enough if your agreement allows that. For larger jobs, use a signed variation form.
Be careful with cancellations too. If you sell at the customer's home after an uninvited approach, the Fair Trading Act 1986 rules for uninvited direct sales may apply. These rules can give the customer a five working day cooling-off period after they receive the written agreement, along with strict disclosure requirements. If your sales model includes door-knocking, in-home sales visits or phone approaches that the customer didn't invite, get advice on your sign-up process.
Your terms should also avoid overreaching. A blanket clause saying the customer must pay everything no matter what may not hold up well if it's misleading, unfair or inconsistent with consumer rights.
What Warranties And Consumer Guarantees Apply To Residential Work?
Residential customers have strong rights, so your agreement can explain warranties and processes, but it can't remove the consumer guarantees that apply by law.
Under the Consumer Guarantees Act 1993, goods you supply to a consumer must generally be of acceptable quality, fit for purpose, match their description or sample, and be delivered as agreed. Services must be carried out with reasonable care and skill, be fit for the agreed purpose, and be completed within a reasonable time if no time is agreed.
For home renovation businesses, this means you need to think carefully about:
- product descriptions in quotes, brochures and emails
- claims about durability, waterproofing, stain resistance or expected lifespan
- whether a product is suitable for the customer's home and intended use
- who is responsible under your supplier agreement if a manufacturer's product fails versus if installation work is faulty
The Fair Trading Act 1986 also matters. You shouldn't overstate what a product can do, hide key exclusions, or advertise a warranty in a way that makes it sound like the customer has fewer rights than the law gives them.
If your work is residential building work, the Building Act 2004 may imply warranties into the contract. These include warranties that the work will be done competently, using suitable materials, and in line with the plans and legal requirements. These implied warranties can last for 10 years from completion. There are also 12-month defect notification rules for residential building work, where customers can raise certain defects after completion.
Your agreement should clearly separate:
- manufacturer warranties: what the product maker promises, and how claims are made
- your workmanship warranty: what you'll fix if your installation is faulty
- statutory rights: rights the customer has under laws such as the Consumer Guarantees Act and Building Act
This helps avoid promising more than you intend, while still respecting the rights your customer has under New Zealand law.
Supply And Install Agreement Template: What To Include
A template can be a useful starting point, but it should be tailored to your products, your sales process and the way your installers actually work.
Before you use any template, map out your customer journey from first quote to final payment. Your agreement should match that journey, otherwise your staff may ignore it and customers may be confused.
A practical supply and installation contract outline could include:
- Parties: your business details, NZBN if relevant, and the customer's details.
- Quote And Scope: the products, installation work, inclusions, exclusions and assumptions.
- Measurements And Design Approval: who measures, when measurements become final, and how designs are approved.
- Price: GST treatment, product costs, labour, freight, disposal fees and any allowances.
- Deposit And Payment Schedule: when payments are due, what the deposit covers, and what happens if payment is late.
- Ordering And Lead Times: when products are ordered, estimated delivery dates, and supplier delay risks.
- Site Access And Readiness: access, parking, power, safety, pets, other trades and preparation the customer must complete.
- Variations: how changes are requested, priced, approved and paid for.
- Installation: how installation will be scheduled, what happens if hidden issues are found, and when completion occurs.
- Delays And Events Outside Your Control: supplier shortages, freight issues, weather, illness and access problems.
- Warranties And Defects: manufacturer warranties, workmanship processes, statutory rights and defect reporting.
- Customer Responsibilities: accurate information, timely decisions, approvals, safe access and care of installed products.
- Cancellations: cancellation fees, non-refundable committed costs, cooling-off rights where they apply, and refunds.
- Privacy: how you collect and use customer information, especially if you take photos, use job management software or share details with subcontractors.
- Photos And Marketing: whether you can use before-and-after photos, and how you'll get consent.
- Subcontractors: whether you can use installers or specialist trades, and how they're managed.
- Limits Of Liability: fair limits that don't try to exclude non-excludable consumer guarantees.
- Acceptance: how the customer accepts the terms, such as signing, paying a deposit or confirming by email.
Have a lawyer or suitable legal professional tailor this before you use it. A generic set of trade services terms may miss the details that matter most for your work, especially if you do custom products, residential building work over $30,000, or in-home sales.
Common Mistakes To Avoid
The most common mistake is relying on a quote alone, then trying to solve legal and practical issues after the customer is already unhappy.
Watch out for these traps:
- Saying all deposits are non-refundable: this can create problems if the amount goes beyond your genuine costs or if consumer law gives the customer a remedy.
- Ordering custom products too early: get final measurements and written design approval before you commit to manufacturing.
- Leaving site readiness vague: tell the customer exactly what needs to be done before installation day.
- Accepting verbal variations: even friendly customers can forget what was agreed when the final invoice arrives.
- Overpromising dates: use realistic timeframes and explain supplier lead times. If a date is an estimate, say so clearly.
- Ignoring product care instructions: customers need to know how to maintain flooring, cabinetry, benchtops or finishes after installation.
- Trying to contract out of consumer rights: residential customers usually keep their Consumer Guarantees Act rights, even if your terms say otherwise.
If something has already gone wrong, start by gathering the paperwork. Keep the quote, signed terms, emails, text messages, photos, site notes, supplier invoices and any variation approvals. Then work out whether the issue is a product fault, installation issue, customer-caused damage, site condition problem or scope misunderstanding.
That step matters because each issue has a different answer. A scratched benchtop caused during installation isn't the same as a colour variation in natural stone, and neither is the same as a customer changing their mind after manufacture.
Key Takeaways
- A supply and install agreement helps your renovation business manage deposits, custom orders, installation timing and customer expectations.
- If residential building work is $30,000 or more including GST, Building Act contract and disclosure rules may apply.
- Your terms should deal with measurements, site access, delays and variations before the customer pays a deposit.
- You can't remove Consumer Guarantees Act rights for ordinary residential customers, but you can explain your warranty process clearly.
- Generic templates often miss the practical details that matter for kitchens, flooring, joinery, blinds and fixtures.
- Written approvals, photos and records make it much easier to resolve questions about scope, defects and payment.
If you'd like help with your customer terms, supply and installation contracts, deposit clauses or residential renovation warranty wording, you can reach us at 0800 002 184 or team@sprintlaw.co.nz for a free, no-obligations chat.








