Customer Terms And Conditions Checklist For Tradies

byAlex Solo9 min read

Yes, your trade business should have written customer terms before you start a residential or small commercial job. A clear quote is helpful, but it usually isn't enough on its own.

The slightly trickier part is that tradie terms need to do more than list a price. They need to deal with deposits, progress payments, site access, changes to the scope, cancellations, delays, defects and the customer rights you can't contract out of under New Zealand law.

This doesn't have to be complicated. Your terms just need to match the way you actually work, so you're not trying to solve payment or variation issues after the job has already gone sideways.

What Terms And Conditions Do Tradies Need In NZ?

You need customer terms that sit alongside your quote or customer contract and clearly say how the job will be priced, carried out, changed, paid for and signed off.

For most tradies, this means your paperwork should include:

  • A quote or estimate setting out the job, exclusions, price and GST position
  • Customer terms and conditions covering payment, variations, delays, cancellations, defects and liability
  • A residential building contract where the job requires one under the Building Act 2004
  • Any required disclosure documents for larger residential building work

If you're doing residential building work worth $30,000 or more including GST, you generally need a written contract, and you must give the homeowner the prescribed disclosure information and checklist before the contract is entered into. You may also need to provide these documents for smaller jobs if the client requests them.

Even if your jobs are smaller than that, written terms are still a smart move. Without them, you may struggle to show what was included in your price, when payment was due, or whether a customer's requested extra work was part of the original job.

Your terms also need to fit with the Consumer Guarantees Act 1993 and the Fair Trading Act 1986. For example, you can't tell a residential customer they have no rights if the work isn't carried out with reasonable care and skill. For business customers, you may have more room to limit certain obligations, but the wording needs to be carefully drafted and fair.

What Should Your Quote And Scope Clause Say?

Your quote and scope clause should say exactly what you're doing, what you're not doing, and what assumptions your price is based on.

This is the clause that often saves you when a customer says, I thought that was included. A good scope clause makes the boundaries of the job clear before anyone picks up tools.

What To Include In The Scope

  • The site address and the areas of the property you'll work on
  • The trade services you'll provide, such as plumbing, electrical, painting, landscaping or installation work
  • The materials, fixtures or equipment included in your price
  • Whether your price includes GST
  • Any exclusions, such as council fees, engineering reports, specialist testing, rubbish removal or work by other trades
  • Any assumptions, such as clear access, existing services being compliant, or the customer supplying accurate measurements

Try to avoid vague phrases like complete bathroom works unless the detail is set out somewhere else. If you're not replacing pipework behind walls, say so. If painting excludes ceiling repairs, say so. If your quote assumes daytime access and off-street parking, say so.

For example, Maia runs a small painting business in Hamilton. Her quote says she will paint the internal walls of three bedrooms, but it also says the price excludes plaster repairs, mould treatment and painting wardrobes. When the customer later asks for wardrobes to be painted too, Maia can point to the scope and price that extra work as a variation.

Your scope clause should also say what happens if hidden conditions appear, like rotten framing, unsafe wiring, asbestos concerns, water damage or non-compliant previous work. You don't want to absorb the cost of problems you couldn't reasonably see when you quoted.

How Should Construction Payment Terms Work In NZ?

Your payment terms should tell the customer when each amount is due, what happens if payment is late, and whether you'll use payment claims under the Construction Contracts Act 2002.

For tradies, cash flow is often the difference between a healthy job and a painful one. Payment terms should be clear enough that a customer can read them and know exactly what they need to pay and when.

Common Payment Structures

  • Deposit plus final payment: useful for shorter jobs where you need to order materials before starting
  • Progress payments: useful for larger jobs where payment is tied to milestones, such as completion of rough-in, installation or practical completion
  • Time and materials: useful where the scope is uncertain, but your labour rates, call-out fees, minimum charges and material margins need to be clear

If your work is covered by the Construction Contracts Act 2002, you may be able to issue formal payment claims. These have technical requirements, including how the claim is described, how the amount is calculated and what information is given to the customer. If you want to rely on that process, your terms and invoices should be set up properly.

For ordinary invoices, state the due date in plain language. For example, payment is due within 7 days of invoice date, or payment is due before handover of the completed work. If you charge interest or administration fees for late payment, say exactly how those are calculated. These charges should be reasonable, not a punishment.

Also think about whether you retain ownership of unfixed materials until paid. This can be useful for materials stored offsite or delivered to site but not yet installed, although the practical effect depends on the facts. Your terms shouldn't overpromise what you can actually control.

Can You Charge For Variations, Delays And Cancellations?

Yes, you can usually charge for variations, delays and cancellations if your terms explain when those charges apply and the charges are reasonable.

This is one of the most important parts of practical terms of trade for trade services. Jobs change. Customers ask for extras. Materials are unavailable. Other trades run late. Weather gets in the way. Your terms should explain how those changes affect price and timing.

Variation Clauses

A variation clause should say that extra work, changed materials, changed timing or work outside the original scope may change the price and completion date.

Ideally, require variations to be approved in writing before you do the work. Written doesn't always need to mean a formal signed document. Depending on your terms, an email or text message approval may be enough. The key is that you can prove what changed and what the customer agreed to pay.

Say Mike installs heat pumps in Tauranga. His original quote is $4,800 including GST, with a 30% deposit of $1,440 and the balance due on completion. Halfway through, the customer asks for extra ducting that will cost $650. Mike's terms say variations must be approved by text or email before work starts. He texts the price and delay, the customer replies approved, and the final invoice is $4,010. That's the original $4,800, less the $1,440 deposit, plus the $650 variation.

Delays And Cancellations

Your delay clause should cover things outside your control, such as weather, supplier shortages, unsafe site conditions, missing consents, lack of access and delays caused by the customer or other contractors.

Your cancellation clause should say what happens if the customer cancels after accepting the quote. You may be able to charge for work already done, materials ordered, restocking fees, travel and reasonable lost time. Be careful with blanket non-refundable charges, especially for residential customers. Under the Fair Trading Act, your terms must not mislead customers about their rights, and penalty-style fees can be risky.

What Should Your Defect Rectification Terms Say?

Your defect rectification terms should explain how customers report genuine defects and how you get a fair chance to inspect and fix them.

For residential customers, you need to be careful not to write terms that cut across the Consumer Guarantees Act 1993 or the Building Act 2004. The Consumer Guarantees Act says services must be carried out with reasonable care and skill, be fit for any particular purpose made known to you, and be completed within a reasonable time if no time is agreed.

The Building Act also includes implied warranties for residential building work. These can apply for up to 10 years, and there's a 12-month defect repair period for residential building work where homeowners can require certain defects to be fixed, unless you can show you're not responsible.

Your terms can still set a sensible process. For example, you can require the customer to:

  • notify you of the issue in writing
  • send photos or a clear description of the problem
  • give you reasonable access to inspect the work
  • not arrange someone else to alter the work before you've had a chance to assess it, unless there's an urgent safety issue

Your terms should also explain what isn't a defect. This might include normal wear and tear, damage caused by misuse, failure to maintain the work, movement in the building, work done by someone else, or problems caused by customer-supplied materials.

A fair defect process protects both sides. The customer knows what to do, and you get the chance to put things right before costs or frustrations escalate.

Customer Terms And Conditions Checklist For Tradies

Your customer terms should be tailored to your trade, pricing model and job size. Generic business terms and conditions can be a starting point, but they often miss the details that matter on real residential and small commercial jobs.

Use this outline as a drafting checklist, not as a finished legal document:

  1. Business Details: name your legal entity, NZBN if you use one, contact details and who the customer is contracting with.
  2. Quote And Acceptance: explain how long quotes stay open, how the customer accepts, and when the contract starts.
  3. Scope Of Work: describe what is included, what is excluded, and what assumptions your price relies on.
  4. Customer Responsibilities: cover access, parking, power, water, pets, site safety information and any consents or approvals the customer must arrange.
  5. Price, GST And Materials: state whether prices include GST, how materials are selected, and how substitutions are handled if stock changes.
  6. Deposits And Progress Payments: set due dates, milestone payments, invoice timing and whether payment is needed before the next stage starts.
  7. Payment Claims: say whether you may issue payment claims under the Construction Contracts Act 2002, and make sure your paperwork is consistent with that process.
  8. Variations: require written approval for extra work, changed materials, site surprises or customer-requested changes.
  9. Delays And Extensions Of Time: explain how delays outside your control affect completion dates and costs.
  10. Cancellations And Rescheduling: set out what happens if the customer cancels, postpones or doesn't provide access.
  11. Completion And Handover: explain when the job is treated as complete, how minor touch-ups are handled, and when final payment is due.
  12. Defects And Rectification: set a practical reporting and inspection process while preserving rights that can't be excluded.
  13. Warranties And Consumer Laws: refer to the Consumer Guarantees Act, Fair Trading Act and any Building Act obligations that apply.
  14. Liability Limits: for business customers, consider reasonable limits on indirect loss, but don't try to exclude liability where the law won't allow it.
  15. Photos, Reviews And Privacy: get permission before using before-and-after photos, customer names or site details in marketing, and comply with the Privacy Act 2020 if you collect personal information.
  16. Subcontractors And Health And Safety: say whether you can use subcontractors and how site safety responsibilities are managed.
  17. Governing Law: state that New Zealand law applies.

Before you use the terms, have them checked against how your business actually quotes, invoices and delivers work. The best terms are the ones your team can follow consistently.

Key Takeaways

  • Your quote should be backed by customer terms that cover scope, payment, variations, delays, cancellations and defects.
  • For residential building work worth $30,000 or more including GST, you generally need a written contract and must give the homeowner the prescribed disclosure information and checklist before the contract is entered into.
  • Clear payment clauses help protect cash flow, especially where you use deposits, progress payments or Construction Contracts Act payment claims.
  • A variation clause should require written approval before extra work is done, even if approval happens by email or text.
  • Defect rectification terms should give you a fair chance to inspect and fix issues without cutting across the Consumer Guarantees Act or Building Act.
  • Generic templates often miss trade-specific details, so your terms should be tailored before you use them with customers.

If you'd like help with your customer terms, payment clauses, variation process and defect rectification terms, you can reach us at 0800 002 184 or team@sprintlaw.co.nz for a free, no-obligations chat.

Lock in the contract

Turning the information into a usable contract

Once money, deliverables or customer obligations are involved, the next step is usually a clear contract that matches how the business actually works.

Alex Solo
Alex SoloCo-Founder

Alex is a co-founder of Sprintlaw. Alex previously worked at a top-tier firm as a lawyer specialising in technology and media contracts, and founded a digital agency which he sold in 2015.

Lock in the contract

Get in touch with our team

Tell us what you need and we'll come back with a fixed-fee quote - no obligation, no surprises.

Need support?

Need help with your business legals?

Speak with Sprintlaw to get practical legal support and fixed-fee options tailored to your business.